Update – September 2021

Water Infrastructure Holdings, LLC’s objective is to have the waterline extension installed as soon as possible.  With this in mind, WIH has retained an engineering firm to design the water distribution system, and that work is now getting under way. As the first task to be completed, the engineering firm completed a survey and is developing the layout for the water mains.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *