Update – September 2021
Water Infrastructure Holdings, LLC’s objective is to have the waterline extension installed as soon as possible. With this in mind, WIH has retained an engineering firm to design the water distribution system, and that work is now getting under way. As the first task to be completed, the engineering firm completed a survey and is developing the layout for the water mains.
Leave a Reply
Want to join the discussion?Feel free to contribute!