In the Field Photos:
WIH survey team used drones as part of utility identification and survey work for the water line. The work provides information needed to design the path of the water line.
Water Infrastructure Holdings (WIH), LLC will design and construct a waterline extension from the Village of Metamora over an approximate two-year period. WIH will purchase potable water to be supplied through a metered connection to the Village water system. We look forward to completing this important project and will provide updates and a more detailed schedule as we move forward.