Latest WIH Update

  • Update – Dec. 19, 2023December 19, 2023 - 5:34 pm

    Water Infrastructure Holdings (WIH) is continuing to make progress in modifying the route for the extended waterline. Over the summer, the WIH technical team completed field work and evaluations necessary to modify the waterline route, and this fall the design package was revised to reflect the modified route.  The design has been submitted to the […]

  • Update – November 2022November 23, 2022 - 1:09 pm

    The Water Infrastructure Holdings, LLC (“WIH”) potable waterline extension design continues to move forward. A majority of easements has been received, and WIH has begun the process of submitting permit applications to the Michigan Department of the Environment, Great Lakes and Energy (EGLE) and the Lapeer County Road Commission. To support the design work, a […]

  • Update – July 2022July 26, 2022 - 2:36 pm

    As we continue to design the potable water system, Water Infrastructure Holdings (WIH) representatives met with customers two times regarding the design of customer piping from the water main to their homes. We reviewed the location of the current water well, connections to indoor plumbing and outdoor spigots, and other utilities to determine the best path […]